Commercial & Office

Bank of America Plaza

Bank of America Plaza

Columbia, South Carolina
Energy conservation measures helped a South Carolina office building cut annual utility costs by $43,000 and become the first existing building in the state to achieve a LEED® Gold rating.

View Case Study (PDF)

Alberici Constructors
Alberici Constructors
Saint Louis, Missouri


A Missouri construction company leveraged Johnson Controls' building system integration capabilities to achieve 60% higher efficiency at its new world headquarters - the world's greenest building.

View Case Study (PDF)


Bank of America Plaza
Bank of America Plaza
Columbia, South Carolina 


Energy conservation measures helped a South Carolina office building cut annual utility costs by $43,000 and become the first existing building in the state to achieve a LEED® Gold rating.

View Case Study (PDF)


Centro Comercial Lider
Centro Comercial Lider
Caracas, Venezuela


State-of-the art technology seamlessly runs all business, building and specialty systems within this retail complex, providing a comfortable, safe and secure environment for nearly 50,000 daily visitors.

View Case Study (PDF)


Colony Park
Colony Park
Jackson, Mississippi


With real-time visibility into energy consumption, utility costs and greenhouse gas emissions across its portfolio of buildings, a mixed-use development expects to save 15-20% in energy savings.

View Case Study (PDF)


Diversey
Diversey
Sturtevant, Wisconsin


Teamwork and planning helped to make this new corporate headquarters an example of cost-effective sustainable design; construction was completed at a cost 10-15% below the U.S. average.

View Case Study (PDF)


Empire State Building
Empire State Building 
New York New York


The iconic building is being retrofitted to become 38% more energy efficient. The innovative approach to deep energy retrofits is projected to save $4.4 million in annual energy costs with a 3.1 year payback on incremental costs.

View Case Study (PDF)


The Hi-Rise Group, Inc.
The Hi-Rise Group, Inc.
Hamilton, Ontario, Canada


Industry expertise, combined with integration capabilities, delivered success in the on-time, on-budget construction of a new federal government building in Ontario, Canada.

View Case Study (PDF)


Integrated Design Associates, Inc. (IDeAs)
Integrated Design Associates, Inc. (IDeAs)
San Jose, California

A unique HVAC and control system contributed to minimizing this design firm's energy consumption, making it the first commercial office building in the United States to achieve net-zero energy.

View Case Study (PDF)


Johnson Controls Brengel Technology Center
Johnson Controls
Brengel Technology Center

Milwaukee, Wisconsin

The award-winning building is a showcase for Johnson Controls energy efficient technologies, and demonstrates how it's possible to build a high-performance green building within a conventional budget.

View Case Study (PDF)


Johnson Controls Corporate Headquarters Campus
Johnson Controls
Corporate Headquarters Campus
Glendale, Wisconsin

Four buildings on the Johnson Controls corporate campus were recently awarded LEED Platinum certification, the highest concentration of LEED Platinum buildings ever recognized by the U.S. Green Building Council.

View Case Study (PDF)


Miller Park

Michigan Healthcare Insurer
Detroit, Michigan


An innovative cooling solution, designed and installed by Johnson Controls, maintains continuous cooling of this critical data center environment and helps ensure uninterrupted access to data for members and caregivers and keeps the process of care in motion.



View Case Study (PDF)


Miller Park
Miller Park
Milwaukee, Wisconsin


A Johnson Controls Metasys® building management system controls nearly 350 pieces of HVAC for the convertible-roof major-league stadium, contributing to fan comfort and energy savings.

View Case Study (PDF)


Pier 1

Pier 1
San Francisco, California


Prologis is using PACE financing to cut energy bills and install solar at the Class A office space on Pier 1 in San Francisco.

View Case Study (PDF)


QS/1 Data Systems
QS/1 Data Systems
Spartanburg, South Carolina


Our industry expertise helped make the LEED certification and commissioning processes flow smoothly for a high-tech company going green.

View Case Study (PDF)


Securities Commission Headquarters
Securities Commission Headquarters
Kuala Lumpur, Malaysia

In Malaysia’s first modern facility with fully ductless air conditioning, a state-of-the-art building management system controls the under-floor air terminals, mechanical and electrical systems. 

View Case Study (PDF)


Security Benefit Group
Security Benefit Group
Topeka, Kansas


A carefully coordinated design and construction process brought this financial services company's vision to life in a building that delivers both associate comfort and reduced maintenance costs. 

View Case Study (PDF)


Shanghai World Financial Center
Shanghai World Financial Center
Pudong Shanghai, China


Johnson Controls was selected to design, install and implement a single converged network that supports all business and building systems in this 104-story Shanghai sensation known as the “sky garden in the city."

View Case Study (PDF)


Technology Manufacturer

Technology Manufacturer
Round Rock, Texas


With a goal of cutting energy consumption by 10% at their world headquarters, this technology manufacturer looked to Johnson Controls and achieved $1 million in energy savings by outfitting their Trane® chillers with YORK® OptiSpeed® Variable-Speed Drives.

View Case Study (PDF)


Toronto Dominion Centre Case Study
Toronto-Dominion Centre
Toronto, Canada


Upgrades to one of the largest Metasys® building management systems in North America help Toronto-Dominion Centre achieve LEED® Gold Certification and drive significant energy savings in over 4.3 million square feet of office and retail space.

View Case Study (PDF) 


Wilson, Blanchard Management Inc. Commerce Place II
Wilson, Blanchard Management Inc. Commerce Place II
Hamilton, Ontario Canada

Leveraging its service relationship with Johnson Controls, Wilson, Blanchard is making Commerce Place II a more comfortable place for tenants, while showcasing its commitment to sustainability and energy efficiency through LEED® certification. 

View Case Study (PDF)