Education
Salt Lake City, Utah
Solar for Schools combines technology with teacher training and student engagement.
View Case Study (PDF) I Watch Video
Tallahassee Community College
Tallahassee, Florida
Faced with an aging infrastructure and rising utility costs, this college turned to Johnson Controls to develop a performance contract that funded a series of upgrades to its control, lighting and water systems.
View Case Study (PDF)
Tulane University
New Orleans, Louisiana
After Hurricane Katrina caused extensive damage to Tulane University, Johnson Controls repaired more than $28 million in mechanical and electrical systems and delivered additional cooling capacity.
View Case Study (PDF) | Watch Video
Aiken, South Carolina
Performance contract guaranteed savings fund classrooms, lighting and HVAC, reducing energy consumption by 12% saving this school district $320,000 per year.
View Case Study (PDF)
Aberdeen, Mississippi
Guaranteed annual energy savings of $94,463 for 12 years via the performance contracting finance method allowed this district to fund upgrades through the project’s savings.
View Case Study (PDF)
Anderson, South Carolina
No tax increase was needed to create a more productive learning environment. Guaranteed savings from a performance contract financed upgrades that will save this district $560,000 per year.
View Case Study (PDF)
Baltimore, Maryland
Facility improvements designed to ensure healthy, safe, secure and technology-advanced schools in Baltimore are expected to save the district nearly $49 million in expenses over 15 years.
View Case Study (PDF)
United Kingdom
The Metasys® building management system leverages an existing, comprehensive IT network in this UK school system to facilitate remote monitoring and management of energy use.
View Case Study (PDF)
Broward County, Florida
This school district will realize more than $18 million in operational savings under a multi-phase performance contract to make energy-saving improvements at more than 25 facilities.
View Case Study (PDF)
Buffalo, New York
This district modernized its facilities and equipment to provide a safer, more secure academic environment through a performance contract guaranteeing savings of $20 million over 20 years.
View Case Study (PDF)
Milwaukee, Wisconsin
An innovative lease-to-own solution for building systems allowed this public charter school to be built without diverting funds from technology inherent to its design and mission.
View Case Study (PDF)
Local School District
Zanesville, Ohio
When this Ohio school district couldn't fund a promise to install air conditioning in one of its elementary schools, an energy audit identified additional efficiency measures to cover the cost.
View Case Study (PDF)
Public School District
Fort McMurray, Alberta
Performance contract financing allowed this district to renew facilities, reduce operating costs and revitalize the students' surroundings while contributing to a cleaner environment.
View Case Study (PDF)
Glendale, Wisconsin
A Solar Pool Heating System is making a big impact on this small school district, allowing it to save $5,000 annually and achieve a 3.5-year payback on the system.
View Case Study (PDF)
Wauchula, Florida
This district realized energy and operational savings of more than $3.1 million over a 10-year performance contract, which paid for equipment improvements and yielded funds for future use.
View Case Study (PDF)
Houghton, Michigan
A bond referendum, coupled with a performance contract, resulted in facility and technology upgrades, building expansion, and operational cost savings of more than $3 million for this district.
View Case Study (PDF)
Marine Military Academy
Harlingen, Texas
Cadet regimen uninterrupted while HVAC equipment and control system upgrades contribute to $1 million in energy savings.
Middleton-Cross Plains Area School District
Middleton, Wisconsin
When the city of Middleton learns about the school district saving $2.6 million in energy and water, it also enters a performance contract to improve lighting efficiency and more.
View Case Study (PDF)
High School District
Northfield, Illinois
A performance contract allowed this district to make significant improvements as its facilities were being renovated and obtain over $4.1 million in energy savings and avoided capital costs.
View Case Study (PDF)
Regional Division No. 10
Alberta, Canada
To create a high-performing learning environment with decreasing funds, a performance contract allowed this district to make facility upgrades, reduce energy use and cut greenhouse gas emissions.
View Case Study (PDF)
Regina, Saskatchewan
Facility upgrades, including the installation of a Metasys® building management system, helped this district reduce energy consumption; the savings were used to fund deferred maintenance.
View Case Study (PDF)
Saskatoon, Saskatchewan
Energy Smart program a super-sized success for Saskatoon Public Schools
View Case Study (PDF)
Independent School District
Houston, Texas
With rising utility costs and a declining budget, this district implemented a program to improve operating efficiency and, as a result, is expected to save an estimated $7.3 million over the three-phase project.
View Case Study (PDF)
Leonardtown, Maryland
Funded through a performance contract, facility upgrades cut this district's energy costs to pre-1980 levels, even though it added 400,000 square feet of school space.
View Case Study (PDF)
Salt Lake City, Utah
Solar for Schools combines technology with teacher training and student engagement.
View Case Study I Watch Video
Gastonia, North Carolina
The installation of a Solar Pool Heating System saves over $2,000 in annual energy costs and has paved the way for other renewable energy initiatives to be pursued by this district.
View Case Study (PDF)
Whitehall, Pennsylvania
Whitehall/Coplay School District contracted with Johnson Controls to upgrade HVAC
systems and equipment, install renewable energy and become a living laboratory for
students and teachers. The project is expected to reduce utility and operating costs by approximately
$8,457,000.
View Case Study I Watch Video
Winnipeg, Manitoba
Student comfort is important, which is why Winnipeg School Division went to Johnson Controls for improvements to heating and lighting in its aging buildings. Energy savings paid for the $5 million improvements without increasing the Division’s debt.
View Case Study (PDF)
Wyandotte, Michigan
This district was named Michigan's first fully ENERGY STAR® certified school district. Efficiency improvements made here guarantee energy and operational savings of $6.9 million over 15 years.
View Case Study (PDF) | Watch Video
Frederick, Maryland
An integrated building management system handles routine duties once performed by this college's support staff, freeing them to focus on activities that increase the satisfaction of students and staff.
View Case Study (PDF)
Harrisburg, Pennsylvania
The cost of making energy-efficient facility improvements was offset by $7.1 million in guaranteed energy and operational cost savings generated through performance contracts.
View Case Study (PDF)
Raymond, Mississippi
Facility upgrades, energy conservation measures and improved facility controls have provided annual savings of more than $850,000, dollars now available to make additional campus improvements.
View Case Study (PDF)
Gresham, Oregon
An Oregon college uses energy savings to conquer deferred maintenance and install one of the country's largest wireless building management systems.
View Case Study (PDF) | Watch Video
Community College
Gardner, Massachusetts
With the installation of a Solar Thermal Hot Water Heating System, Johnson Controls is helping the college reduce its overall energy bill and take its renewable energy initiatives to the next level.
View Case Study (PDF)
Tallahassee, Florida
Faced with an aging infrastructure and rising utility costs, this college turned to Johnson Controls to develop a performance contract that funded a series of upgrades to its control, lighting and water systems.
View Case Study (PDF)
Weatherford, Texas
Performance contracting, combined with facility management, provides nearly $4 million in savings, improved campus appearance, and allows Weatherford to focus in its core competency - education.
View Case Study (PDF) | Watch Video
Ave Maria, Florida
Ave Maria converged nearly two dozen disparate systems from information technology (IT) to facility operations onto a single IP network, saving nearly $1 million a year.
View Case Study (PDF) | Watch Video
Columbia, South Carolina
Through a series of lighting retrofits and a new Metasys® building management system, Benedict College enhanced the campus living environment and increased recruitment and retention of students.
View Case Study (PDF)
Bowie, Maryland
Maryland's oldest HBCU is expecting to save $4.1 million through energy and water improvements and renewable energy, emitting 1,593 fewer tons of CO2 annually.
View Case Study (PDF)
Bryn Mawr, Pennsylvania
Demand response helped the college save energy, reduce its carbon footprint and save $300,000.
View Case Study (PDF)
Helena, Montana
An energy- and water-efficiency program to replace old boilers, upgrade lighting, and install a large-scale wireless building control system is complementing this college’s sustainability goals and reducing costs by $200,000 per year.
View Case Study (PDF) | Watch Video
Delaware Valley College
Bucks County, Pennsylvania
A comprehensive demand response program provides a consistent revenue stream for this private college.
View Case Study (PDF)
Ft. Myers, Florida
To keep pace with 10-15% enrollment increases, FGCU needed to expand its cooling capacity efficiently. System upgrades, funded through a performance contract, save the campus $144,000 annually.
View Case Study (PDF)
Tallahassee, Florida
Conservation initiatives at FSU have resulted in improved academic environments, reduced environmental impact of facilities and energy savings of nearly $12.5 million since 1997.
View Case Study (PDF)
Georgia Institute of Technology
Atlanta, Georgia
The Metasys® building management system on Georgia Tech's campus is one of the largest installations of it's kind in the country. It manages 85 buildings and achieved the Silver Certification under the US Green Building Council's Leadership in Energy and Environmental Design (LEED®) rating system.
Thunder Bay Ontario
Financed much-needed deferred maintenance on limited capital resources through a 20-year performance contract, resulting in guaranteed annual energy savings starting at $1.3 million.
View Case Study (PDF)
Baton Rouge, Louisiana
Energy-efficiency initiatives generate a savings of $5 million per year for 10 years, enabling the university to upgrade facilities, purchase new equipment and plan for future improvements.
View Case Study (PDF)
Alberta, Canada
Lighting retrofits reduced energy costs by 10-15% on this campus, for a total of $60,000 a year, enabling administrators to absorb budget cuts without affecting classroom quality.
View Case Study (PDF)
Bristol, Rhode Island
By integrating existing, disparate management and security systems, Johnson Controls helped this university reduce operational costs and better protect its people, property and assets.
View Case Study (PDF)
Tulane University
New Orleans, Louisiana
After Hurricane Katrina caused extensive damage to Tulane University, Johnson Controls repaired more than $28 million in mechanical and electrical systems and delivered additional cooling capacity.
View Case Study (PDF) | Watch Video
Davis,California
A design-build retrofit by Johnson Controls will yield triple bottom line results for the University of California-Davis. This project will reduce the college’s energy consumption by more than 2.8 million kilowatt-hours per year and result in estimated savings of $370,000 annually.
View Case Study (PDF)
Edmond, Oklahoma
UCO is delivering a quality learning environment while saving more than $850,000 annually under a performance contract with Johnson Controls that includes facility upgrades and conservation measures.
View Case Study (PDF) | Watch Video
Gainesville, Florida
An innovative retro-commissioning and training strategy paired Johnson Controls and University of Florida staff side-by-side and resulted in a 22% return on investment, improved expertise and sustainable performance.
View Case Study (PDF)
University of Massachusetts Amherst
Amherst, Massachusetts
Under a 10-year performance contract, Johnson Controls implemented water and energy conservation measures on campus worth $40 million; initiatives guaranteed to pay for themselves through the estimated $55 million in savings.
View Case Study (PDF)
Twin Cities & Duluth, Minnesota
In the largest application of the Metasys® building management system in North America, the University of Minnesota monitors and controls nearly 60,000 physical points, including security and fire alarm systems, from a single user interface.
View Case Study (PDF)
Oshkosh, Wisconsin
Partners since 1992, Johnson Controls and UW-Oshkosh are now collaborating on a plan to help the campus become is one of the first major universities in the country to be carbon neutral.
View Case Study (PDF)
Milwaukee, Wisconsin
From groundskeeping to security to plant operations, the services provided under this university's Facilities Management agreement with Johnson Controls makes students and their families feel welcome and safe.