HVAC Equipment

McCormack Building

McCormack Building

Boston, Massachusetts
The addition of a hybrid chiller plant is increasing cooling capacity and decreasing utility costs by more than $500,000 annually at this Commonwealth of Massachusetts building.

View Case Study (PDF)

Accor Economy Lodging
Accor Economy Lodging
Columbus, Ohio 


A Johnson Controls FlexSys underfloor-air distribution system helps create a "wow" factor at this call center designed to attract and retain employees in a tight labor market.

View Case Study (PDF)


DST
DST
Kansas City, Missouri 


A raised-floor HVAC system reduces construction costs by as much as 10% and helps to turn a 1920s warehouse into a high-tech contemporary home for this financial services company.

View Case Study (PDF)


DST Output
DST Output
Kansas City, Missouri 


Contractors preserved building aesthetics while delivering comfort cooling in this property on the National Register of Historic Places, thanks to a FlexSys™ underfloor-air distribution system.

View Case Study (PDF)


FedEx® Institute of Technology
FedEx® Institute of Technology
Memphis, Tennessee


An underfloor-air-distribution system provides access to voice, data and power systems, and is flexible enough to keep pace with rapid changes in technology in this $23 million facility.

View Case Study (PDF)


Jackson County

Marine Military Academy
Harlingen, Texas    


Cadet regimen uninterrupted while HVAC equipment and control system upgrades contribute to $1 million in energy savings.

 

View Case Study (PDF)


McCormack Building
McCormack Building
Boston, Massachusetts


The addition of a hybrid chiller plant is increasing cooling capacity and decreasing utility costs by more than $500,000 annually at this Commonwealth of Massachusetts building.

View Case Study (PDF) 


Mease Manor Retirement Community

Mease Manor Retirement Community
Dunedin, Florida


Chiller upgrades at this retirement facility helped to reduce costs, increase energy efficiency and attract tech-savvy residents.

View Case Study (PDF)


Michigan Alternative and Renewable Energy Center
Michigan Alternative and
Renewable Energy Center

Muskegon, Michigan 

This Michigan building became one of the first in the state to achieve LEED Gold certification, obtained in part by employing the Johnson Controls FlexSys™ underfloor-air distribution system.

View Case Study (PDF)


Parrish Health Care Center at Port St. John
Parrish Health Care Center
at Port St. John

Cocoa, Florida 

The installation of an air-cooled chiller at this new outpatient facility resulted in lower installation and operating costs, contributing to this health care center's LEED project goals.

View Case Study (PDF)


Phoenix Hospital
Phoenix Children's Hospital
Phoenix, Arizona

Improved operational efficiency and financial predictability result from strategic approaches to this expanding hospital’s facilities management, and the recent construction and ongoing maintenance of the central utility plant.

View Case Study (PDF) 



St. Michael's Hospital
St. Michael's Hospital
Toronto, Canada


A major heating and cooling system retrofit, including the replacement of two aging chillers, leads to $1.4 million (Canadian) annual savings for this Toronto hospital.

View Case Study (PDF)


Waldo County General Hospital
Waldo County General Hospital
Belfast, Maine 


A new cooling system brings reliable comfort, redundancy and energy efficiency to this Maine hospital, saving the facility nearly $50,000 in annual electricity costs.

View Case Study (PDF)