HVAC Equipment
McCormack Building
Boston, MassachusettsThe addition of a hybrid chiller plant is increasing cooling capacity and decreasing utility costs by more than $500,000 annually at this Commonwealth of Massachusetts building.
View Case Study (PDF)
Columbus, Ohio
A Johnson Controls FlexSys underfloor-air distribution system helps create a "wow" factor at this call center designed to attract and retain employees in a tight labor market.
View Case Study (PDF)
Kansas City, Missouri
A raised-floor HVAC system reduces construction costs by as much as 10% and helps to turn a 1920s warehouse into a high-tech contemporary home for this financial services company.
View Case Study (PDF)
Kansas City, Missouri
Contractors preserved building aesthetics while delivering comfort cooling in this property on the National Register of Historic Places, thanks to a FlexSys™ underfloor-air distribution system.
View Case Study (PDF)
Memphis, Tennessee
An underfloor-air-distribution system provides access to voice, data and power systems, and is flexible enough to keep pace with rapid changes in technology in this $23 million facility.
View Case Study (PDF)
Marine Military Academy
Harlingen, Texas
Cadet regimen uninterrupted while HVAC equipment and control system upgrades contribute to $1 million in energy savings.
Boston, Massachusetts
The addition of a hybrid chiller plant is increasing cooling capacity and decreasing utility costs by more than $500,000 annually at this Commonwealth of Massachusetts building.
View Case Study (PDF)
Mease Manor Retirement Community
Dunedin, Florida
Chiller upgrades at this retirement facility helped to reduce costs, increase energy efficiency and attract tech-savvy residents.
View Case Study (PDF)
Renewable Energy Center
Muskegon, Michigan
This Michigan building became one of the first in the state to achieve LEED Gold certification, obtained in part by employing the Johnson Controls FlexSys™ underfloor-air distribution system.
View Case Study (PDF)
at Port St. John
Cocoa, Florida
The installation of an air-cooled chiller at this new outpatient facility resulted in lower installation and operating costs, contributing to this health care center's LEED project goals.
View Case Study (PDF)
Phoenix, Arizona
Improved operational efficiency and financial predictability result from strategic approaches to this expanding hospital’s facilities management, and the recent construction and ongoing maintenance of the central utility plant.
View Case Study (PDF)
Toronto, Canada
A major heating and cooling system retrofit, including the replacement of two aging chillers, leads to $1.4 million (Canadian) annual savings for this Toronto hospital.
View Case Study (PDF)
Belfast, Maine
A new cooling system brings reliable comfort, redundancy and energy efficiency to this Maine hospital, saving the facility nearly $50,000 in annual electricity costs.
View Case Study (PDF)
