Industrial
Newpark Mats & Integrated Services
Carencro, LouisianaJohnson Controls Service engineered and delivered a turnkey chilled water solution, which helped this customer improve their manufacturing process, while still meeting an aggressive timeline and budget.
View Case Study (PDF)
International, Inc.
Memphis, Tennessee
A service contract for the maintenance and repair of systems and equipment at this mixed-use facility results in savings of 18% in HVAC operations and maintenance costs.
View Case Study (PDF)
Sturtevant, Wisconsin
Teamwork and planning helped to make this new corporate headquarters an example of cost-effective sustainable design; construction was completed at a cost 10 to 15 % below the U.S. average.
View Case Study (PDF)
Minas Basin Pulp & Power Company
Hantsport, Nova Scotia
Johnson Controls implemented, operates and maintains a waste heat recovery system at this recycling company's paperboard mill, reducing the mill's energy consumption by 25% and increasing production throughout.
View Case Study (PDF)
Cherry Point, North Carolina
A comprehensive maintenance strategy established by Johnson Controls allows this Naval Aviation campus to control facility assets with the least amount of resources possible.
View Case Study (PDF)
Carencro, Louisiana
Johnson Controls Service engineered and delivered a turnkey chilled water solution, which helped this customer improve their manufacturing process, while still meeting an aggressive timeline and budget.
View Case Study (PDF)
Rensselaer, New York
Johnson Controls helped this pharmaceutical company meet FDA validation requirements by controlling temperature, humidity, ventilation, pressurization, and security in its new building.
View Case Study (PDF)
Iowa Park, Texas
As part of a performance contract, this specialty packaging manufacturer reduced greenhouse gas emissions and energy costs, including an annual decrease of 8.5 million kW hours of electricity.
View Case Study (PDF)
Grand Rapids, Michigan
The integration of building systems, including fire, HVAC and air quality systems, helped Steelcase earn LEED certification at its newly constructed factory; the first such designation for a manufacturing facility.
View Case Study (PDF)
