Service
ManpowerGroup
Milwaukee, Wisconsin
By retro-commissioning the existing Metasys® building automation system, building performance was optimized and more than $100,000 in annual energy savings were delivered to this workforce solutions provider.
Columbia, South Carolina
The Johnson Controls service team helped identify energy conservation measures within this South Carolina office building, which led to annual utility cost savings of $43,000 and the first LEED® Gold certification for an existing building in the state.
View Case Study (PDF)
Memphis, Tennessee
Johnson Controls provides operational support, maintenance and monitoring for this health care system and identifies opportunities for operational improvement and energy efficiency.
View Case Study (PDF)
St. Petersburg, Florida
A Johnson Controls rental chiller offered this medical center a quick solution to keep cooling operations running smoothly and provided the time to research options and make the right decision after a catastrophic chiller failure.
View Case Study (PDF)
International, Inc.
Memphis, Tennessee
A service contract for the maintenance and repair of systems and equipment at this mixed-use facility results in savings of 18% in HVAC operations and maintenance costs.
View Case Study (PDF)
Charlotte, North Carolina
This Convention Center looks to save money, increase energy efficiency and reduce CO2 emissions through the installation of YORK® OptiSpeed™ variable-speed drive.
View Case Study (PDF)
Sturtevant, Wisconsin
Under an annual agreement, four on-site Johnson Controls technicians provide operations and maintenance on all mechanical, electrical and HVAC systems for this LEED Gold corporate headquarters.
View Case Study (PDF)
Financial Institution
Fort Worth, Texas
The addition of three YORK® OptiSpeed™ variable-speed drives to this customer's Carrier® chillers will result in tremendous energy savings and a ROI of just 2.2 years.
View Case Study (PDF)
Glendale, Wisconsin
Building on a 20-year service partnership, Johnson Controls recommended this middle school install a Solar Pool Heating System; allowing it to save $5,000 annually and achieve a 3.5-year payback on the system.
View Case Study (PDF)
Heritage Hills Golf Resort
York, Pennsylvania
A Johnson Controls rental chiller helped this golf resort achieve success during the inaugural season of an outdoor ice rink attraction, despite unseasonably warm weather.
Hamilton, Ontario, Canada
Johnson Controls oversees all aspects of building operations, from security to waste management and tenant services, in compliance with strict Canadian regulations for this government facility.
View Case Study (PDF)
Houghton-Portage Township Schools
Houghton, Michigan
Under a five-year planned service agreement, Johnson Controls maintains this district's new HVAC equipment and Metasys® building management system, to verify that expected operational cost savings are being realized.
View Case Study (PDF)
Jackson County, Missouri
Johnson Controls designed and installed energy-efficient building improvements, including a Metasys® building management system, to support this county's commitment to reducing energy use which is expected to save taxpayers $7.6 million.
View Case Study (PDF)
Plano, Texas
Johnson Controls manages more than 1,000 JCPenney retail stores, providing workplace, landscaping and call center services that keep operations going smoothly, invisibly, consistently and wisely.
View Case Study (PDF)
ManpowerGroup
Milwaukee, Wisconsin
By retro-commissioning the existing Metasys® building automation system, building performance was optimized and more than $100,000 in annual energy savings were delivered to this workforce solutions provider.
View Case Study (PDF)
Marine Military Academy
Harlingen, Texas
Cadet regimen uninterrupted while HVAC equipment and control system upgrades contribute to $1 million in energy savings.
Mease Manor Retirement Community
Dunedin, Florida
Chiller upgrades at this retirement facility helped to reduce costs, increase energy efficiency and attract tech-savvy residents.
View Case Study (PDF)
Michigan Healthcare Insurer
Detroit, Michigan
An innovative cooling solution, designed and installed by Johnson Controls, maintains continuous cooling of this critical data center environment and helps ensure uninterrupted access to data for members and caregivers and keeps the process of care in motion.
View Case Study (PDF)
Milwaukee, Wisconsin
Johnson Controls assumes management for overall operations of this convertible-roof major-league stadium, driving improved efficiency and performance, and helping the Brewers deliver great fan experiences.
View Case Study (PDF)
Gardner, Massachusetts
With the installation of a Solar Thermal Hot Water Heating System, Johnson Controls is helping the college reduce its overall energy bill and take its renewable energy initiatives to the next level.
View Case Study (PDF)
Newpark Mats & Integrated Services
Carencro, Louisiana
Johnson Controls Service engineered and delivered a turnkey chilled water solution, which helped this customer improve their manufacturing process, while still meeting an aggressive timeline and budget.
View Case Study (PDF)
SNBL USA
Everett, Washington
The installation of a Metasys© building management system provides reliable monitoring and control of temperature and humidity, and ensures the integrity of critical research environments.
View Case Study (PDF)
Technology Manufacturer
Round Rock, Texas
With a goal of cutting energy consumption by 10% at their world headquarters, this technology manufacturer looked to Johnson Controls and achieved $1 million in energy savings by outfitting their Trane® chillers with YORK® OptiSpeed® Variable-Speed Drives.
View Case Study (PDF)
International Airport
Toronto, Ontario
Building on a more than 30-year relationship of providing HVAC operation and maintenance, Johnson Controls is helping this airport meet its goals of environmental sensitivity, financial responsibility, safety and security, and customer service.
View Case Study (PDF)
Port St. Lucie, Florida
This installation of two YORK® OptiSpeed™ variable-speed drives will provide this customer over $100,000 annual energy savings and a ROI of just 1.5 years.
View Case Study (PDF)
Davis, California
A design-build retrofit by Johnson Controls will yield triple bottom line results for the University of California-Davis. This project will reduce the college’s energy consumption by more than 2.8 million kilowatt-hours per year and result in estimated savings of $370,000 annually."
View Case Study (PDF)
Gainesville, Florida
An innovative retro-commissioning and training strategy paired Johnson Controls and University of Florida staff side-by-side and resulted in a 22% return on investment, improved expertise and sustainable performance.
View Case Study (PDF)
Belfast, Maine
After conducting a study of this hospital’s cooling needs, the Johnson Controls service team, in place at this facility for nearly 20 years, proposed a solution to reduce costs and eliminate environmentally-unfriendly refrigerant used in the existing chiller.
View Case Study (PDF)
Gastonia, North Carolina
A Johnson Controls team, servicing controls and HVAC equipment in this district for years, recommended the installation of a Solar Pool Heating System; saving this district over $2,000 in annual energy costs.
View Case Study (PDF)
Hamilton, Ontario Canada
Leveraging its service relationship with Johnson Controls, Wilson, Blanchard is making Commerce Place II a more comfortable place for tenants, while showcasing its commitment to sustainability and energy efficiency through LEED® certification.
View Case Study (PDF)
Milwaukee, Wisconsin
From groundskeeping to security to plant operations, the services provided under this university's Facilities Management agreement with Johnson Controls makes students and their families feel welcome and safe.
View Case Study (PDF)