Service

CPO 30

Research Laboratory

Washington DC area

Implementation of Johnson Controls Central Plant Optimization™ 30 (CPO30) will enable this research laboratory to achieve a 35% improvement in energy efficiency within their central plant, annual energy savings of 1.5M kWh, a reduced carbon footprint and financial savings of $140,000 a year.

View Case Study (PDF)
    

Bank of America Plaza
Bank of America Plaza
Columbia, South Carolina


The Johnson Controls service team helped identify energy conservation measures within this South Carolina office building, which led to annual utility cost savings of $43,000 and the first LEED® Gold certification for an existing building in the state.

View Case Study (PDF)


Baptist Memorial Health Care
Baptist Memorial Health Care
Memphis, Tennessee


Johnson Controls provides operational support, maintenance and monitoring for this health care system and identifies opportunities for operational improvement and energy efficiency.

View Case Study (PDF)


Bayfront
Bayfront Medical Center
St. Petersburg, Florida 


A Johnson Controls rental chiller offered this medical center a quick solution to keep cooling operations running smoothly and provided the time to research options and make the right decision after a catastrophic chiller failure.

View Case Study (PDF) 


Buckman Laboratories International, Inc.
Buckman Laboratories
International, Inc.

Memphis, Tennessee

A service contract for the maintenance and repair of systems and equipment at this mixed-use facility results in savings of 18% in HVAC operations and maintenance costs. 

View Case Study (PDF)


Charolette Convention
Charlotte Convention Center
Charlotte, North Carolina 


This Convention Center looks to save money, increase energy efficiency and reduce CO2 emissions through the installation of YORK® OptiSpeed™ variable-speed drive.

View Case Study (PDF)


Diversey
Diversey
Sturtevant, Wisconsin   


Under an annual agreement, four on-site Johnson Controls technicians provide operations and maintenance on all mechanical, electrical and HVAC systems for this LEED Gold corporate headquarters.

View Case Study (PDF)


Diversey

Financial Institution

Fort Worth, Texas   


The addition of three YORK® OptiSpeed™ variable-speed drives to this customer's Carrier® chillers will result in tremendous energy savings and a ROI of just 2.2 years.


View Case Study (PDF)


Glen Hills Middle School
Glen Hills Middle School
Glendale, Wisconsin    


Building on a 20-year service partnership, Johnson Controls recommended this middle school install a Solar Pool Heating System; allowing it to save $5,000 annually and achieve a 3.5-year payback on the system.    

View Case Study (PDF)


Healthcare Data Center

Healthcare Data Center
Northern Florida  


Healthcare leader maximizes data center uptime, while protecting patient confidentiality, with a Planned Service Agreement powered by Connected Services.

View Case Study (PDF)


Glen Hills Middle School

Heritage Hills Golf Resort
York, Pennsylvania  


A Johnson Controls rental chiller helped this golf resort achieve success during the inaugural season of an outdoor ice rink attraction, despite unseasonably warm weather. 


View Case Study (PDF)


The Hi-Rise Group, Inc.
The Hi-Rise Group, Inc.
Hamilton, Ontario, Canada 


Johnson Controls oversees all aspects of building operations, from security to waste management and tenant services, in compliance with strict Canadian regulations for this government facility.

View Case Study (PDF)


Houghton-Portage Township Schools

Houghton-Portage Township Schools
Houghton, Michigan

Under a five-year planned service agreement, Johnson Controls maintains this district's new HVAC equipment and Metasys® building management system, to verify that expected operational cost savings are being realized.    

View Case Study (PDF)


Jackson County
Jackson County
Jackson County, Missouri     


Johnson Controls designed and installed energy-efficient building improvements, including a Metasys® building management system, to support this county's commitment to reducing energy use which is expected to save taxpayers $7.6 million.      

View Case Study (PDF)


JCPenney
JCPenney
Plano, Texas


Johnson Controls manages more than 1,000 JCPenney retail stores, providing workplace, landscaping and call center services that keep operations going smoothly, invisibly, consistently and wisely.  

View Case Study (PDF)


Mease Manor Retirement Community

ManpowerGroup
Milwaukee, Wisconsin


By retro-commissioning the existing Metasys® building automation system, building performance was optimized and more than $100,000 in annual energy savings were delivered to this workforce solutions provider.

View Case Study (PDF)


Jackson County

Marine Military Academy
Harlingen, Texas    


Cadet regimen uninterrupted while HVAC equipment and control system upgrades contribute to $1 million in energy savings.

 

View Case Study (PDF)


Mease Manor Retirement Community

Mease Manor Retirement Community
Dunedin, Florida


Chiller upgrades at this retirement facility helped to reduce costs, increase energy efficiency and attract tech-savvy residents.

View Case Study (PDF)


Miami Childrens Hospital

Michigan Healthcare Insurer
Detroit, Michigan


An innovative cooling solution, designed and installed by Johnson Controls, maintains continuous cooling of this critical data center environment and helps ensure uninterrupted access to data for members and caregivers and keeps the process of care in motion.
 
View Case Study (PDF)


Miller Park
Miller Park
Milwaukee, Wisconsin    


Johnson Controls assumes management for overall operations of this convertible-roof major-league stadium, driving improved efficiency and performance, and helping the Brewers deliver great fan experiences.

View Case Study (PDF)


Mount Wachusett Community College
Mount Wachusett Community College
Gardner, Massachusetts

With the installation of a Solar Thermal Hot Water Heating System, Johnson Controls is helping the college reduce its overall energy bill and take its renewable energy initiatives to the next level.

View Case Study (PDF)


Newpark Mats & Integrated Services

Newpark Mats & Integrated Services
Carencro, Louisiana


Johnson Controls Service engineered and delivered a turnkey chilled water solution, which helped this customer improve their manufacturing process, while still meeting an aggressive timeline and budget.

View Case Study (PDF)


CPO 30

Research Laboratory
Washington DC Area

 

Implementation of Johnson Controls Central Plant Optimization™ 30 (CPO30) will enable this research laboratory to achieve a 35% improvement in energy efficiency within their central plant, annual energy savings of 1.5M kWh, a reduced carbon footprint and financial savings of $140,000 a year.

View Case Study (PDF)


Newpark Mats & Integrated Services

Sample and Assay Technologies Provider
Maryland


Installation of several YORK® OptiSpeed® variable-speed drives led to increased energy efficiency and an estimated $142,000 in annual energy savings for this technology leader. Additionally, a $56,000 rebate from the local utility helped contribute to an overall ROI of just two years.

View Case Study (PDF)


Newpark Mats & Integrated Services

SNBL USA
Everett, Washington


The installation of a Metasys® building management system provides reliable monitoring and control of temperature and humidity, and ensures the integrity of critical research environments.

View Case Study (PDF)


Technology Manufacturer

Technology Manufacturer
Round Rock, Texas


With a goal of cutting energy consumption by 10% at their world headquarters, this technology manufacturer looked to Johnson Controls and achieved $1 million in energy savings by outfitting their Trane® chillers with YORK® OptiSpeed® Variable-Speed Drives.

View Case Study (PDF)


Toronto Pearson International Airport
Toronto Pearson 
International Airport

Toronto, Ontario    

Building on a more than 30-year relationship of providing HVAC operation and maintenance, Johnson Controls is helping this airport meet its goals of environmental sensitivity, financial responsibility, safety and security, and customer service.

View Case Study (PDF)


Torrey Pines
Torrey Pines
Port St. Lucie, Florida


This installation of two YORK® OptiSpeed™ variable-speed drives will provide this customer over $100,000 annual energy savings and a ROI of just 1.5 years.

View Case Study (PDF)


University of California-Davis
University of California-Davis
Davis, California


A design-build retrofit by Johnson Controls will yield triple bottom line results for the University of California-Davis. This project will reduce the college’s energy consumption by more than 2.8 million kilowatt-hours per year and result in estimated savings of $370,000 annually." 

View Case Study (PDF)


University of Florida
University of Florida
Gainesville, Florida


An innovative retro-commissioning and training strategy paired Johnson Controls and University of Florida staff side-by-side and resulted in a 22% return on investment, improved expertise and sustainable performance.

View Case Study (PDF)


University of Florida

Utility Company
Denver, Colorado


Controls upgrades,a re-commissioning strategy and plant-wide operations and maintenance services brought improved operations, a one-year ROI and a world-class safety focus to this utility company.

View Case Study (PDF)


Waldo County General Hospital
Waldo County General Hospital
Belfast, Maine


After conducting a study of this hospital’s cooling needs, the Johnson Controls service team, in place at this facility for nearly 20 years, proposed a solution to reduce costs and eliminate environmentally-unfriendly refrigerant used in the existing chiller.
 
View Case Study (PDF)


Webb Street School
Webb Street School
Gastonia, North Carolina     


A Johnson Controls team, servicing controls and HVAC equipment in this district for years, recommended the installation of a Solar Pool Heating System; saving this district over $2,000 in annual energy costs.         

View Case Study (PDF)


Wilson Blnachard
Wilson, Blanchard Management Inc. Commerce Place II
Hamilton, Ontario Canada

Leveraging its service relationship with Johnson Controls, Wilson, Blanchard is making Commerce Place II a more comfortable place for tenants, while showcasing its commitment to sustainability and energy efficiency through LEED® certification.

View Case Study (PDF)


Wisconsin Lutheran College
Wisconsin Lutheran College
Milwaukee, Wisconsin


From groundskeeping to security to plant operations, the services provided under this university's Facilities Management agreement with Johnson Controls makes students and their families feel welcome and safe.

View Case Study (PDF)