sunBanner

Don't Sweat It!

Keep your facility running efficiently, reliably and comfortably this summer - and all year - and receive a $750 planned maintenance rebate!

The last thing you need on a scorching summer day is HVAC system failure. Now, it's easier than ever to minimize downtime risk with planned maintenance from Johnson Controls.

 

We're offering a $750 rebate* on new Planned Service Agreements (PSAs) signed by August 1, 2012 on YORK® chillers and Metasys® extended architecture building automation systems. With a Johnson Controls PSA, our highly skilled, factory-trained technicians deliver a sustainable and customizable maintenance program that will:

 

  • Minimize unplanned downtime
  • Optimize occupant comfort
  • Focus on efficiency
  • Reduce energy and overall facility operation costs
  • Extend the life of your HVAC equipment

 

By performing inspections and maintenance on a regular basis, you'll be sure to keep your building's HVAC and building systems operating at peak performance. This summer - and all year.

 

Learn more on our web site about how we can work with you - and your budget - to design a Planned Service Agreement to meet your needs. And, act soon! The $750 rebate offer ends on August 1, 2012.

 

*Details: New Planned Service Agreement (PSA) with Johnson Controls is required. Only new PSAs for YORK chillers or Metasys extended architecture building automation systems in North America are eligible; it is not applicable to PSA renewals. New PSA must be signed between June 1 and August 1, 2012. $750 rebate is applied against the price of a new PSA with Johnson Controls on a YORK chiller or Metasys extended architecture building automation system with a supervisory controller (NxE). Each YORK chiller is eligible for rebate (e.g. if you sign a new PSA for three YORK chillers, you may use three rebates). One $750 rebate per Metasys extended architecture building automation system customer. Total value of new PSA divided by the number of rebates applied must be greater than or equal to $1,500. Existing service contract terms and conditions apply.

 

Banner - Make Your Building Work Calculator
buffalo-new

 

$40 million invested;
$55.5 million saved.

By collaborating with Johnson Controls, the University of Massachusetts is creating a more comfortable and environmentally friendly campus while saving $55.5 million in energy and operational costs over 10 years.