Integrated HVAC Systems
Building Management Systems
Security & Fire Safety Solutions
Technical Building Services
Commercial Refrigeration
Industrial Refrigeration
Global WorkPlace Solutions
Energy Efficiency & Sustainability
Solutions For Your Building
Global Marine and Navy
Efficiency Now Newsletter
HVAC Training Resources
Case Studies
| ▼ | Technology Contracting |
| • | Buildings |
| • | Construction |
| • | Plan/Design |
| • | Build |
| • | Commission |
| • | Subcontractors |
| • | Canadian Construction |
| • | Canadian Small Subcontracts |
| • | U.S. Construction |
| • | Commission |
| • | Outdoor |
| ► | Construction |
| ► | Innovation Services |
| ► | Networked Solutions |
| ► | Service |
Canadian Construction
CANADA - Subcontractor Request for Proposal
This page is to be used only by Johnson Controls L.P. bidding partners to view and download Johnson Controls standard attachments, standards, practices, procedures, documents and forms that are considered part of an installation Subcontract Request for Proposal or Professional Services Request for Proposal and Qualifications.
IMPORTANT NOTE: Submission to Johnson Controls L.P. of a Subcontract Request for Proposal or Professional Services Request for Proposal and Qualifications constitutes an acknowledgement by the bidder that the bidder has visited this site and has downloaded and viewed the contents and format of the standard documents, and that the bidder agrees to use these documents in the execution of any subsequent subcontract, except as specifically noted within the proposal, on and in compliance with ATTACHMENT "C", EXCEPTION TO THIS REQUEST FOR PROPOSAL.
If a copy of this file was downloaded prior to the post date, modifications have been made and you should download the revised file. Select the type of subcontract you are bidding, construction installation services or consulting services, to download the corresponding pdf file.
Review the standard attachment documents BEFORE submitting a proposal. See "IMPORTANT NOTE" above.
This page is to be used only by Johnson Controls L.P. bidding partners to view and download Johnson Controls standard attachments, standards, practices, procedures, documents and forms that are considered part of an installation Subcontract Request for Proposal or Professional Services Request for Proposal and Qualifications.
IMPORTANT NOTE: Submission to Johnson Controls L.P. of a Subcontract Request for Proposal or Professional Services Request for Proposal and Qualifications constitutes an acknowledgement by the bidder that the bidder has visited this site and has downloaded and viewed the contents and format of the standard documents, and that the bidder agrees to use these documents in the execution of any subsequent subcontract, except as specifically noted within the proposal, on and in compliance with ATTACHMENT "C", EXCEPTION TO THIS REQUEST FOR PROPOSAL.
Instructions
Bidder shall verify the current post date of the documents listed below. If you have downloaded this file since the post date, you already have the latest version of attachments and do not need to download a new file.If a copy of this file was downloaded prior to the post date, modifications have been made and you should download the revised file. Select the type of subcontract you are bidding, construction installation services or consulting services, to download the corresponding pdf file.
Review the standard attachment documents BEFORE submitting a proposal. See "IMPORTANT NOTE" above.
Canadian Construction Installation Services
05/13/2003
(Subcontract Proposals $50,000 CAN and Larger)
59 Pages
59 Pages
Standard Attachments for use with subcontracts for construction material and labor as referenced on the standard request for proposal documentation.
These standard attachments apply to all construction trades.
Standard attachments included:
- Subcontract Application for Payment
Subcontract Request for Information
Subcontract Request for Change Order
Subcontract Change Order
Subcontract Request for Final Payment
Master Subcontract Agreement Terms and Conditions
Subcontract Minimum Safety Requirements, including - Pre-Qualification Criteria and Pre-Bid Information
Canadian Consulting Services (Professional Services)
04/15/2003
(Consulting Proposals All Sizes)
41 Pages
41 Pages
Standard Attachments for use with consulting agreements for professional services as referenced on the standard request for proposal documentation.
These standard attachments apply to all consulting disciplines.
Standard attachments included:
- Professional Services Application for Payment
Subcontract Request for Change Order
Subcontract Change Order
Subcontract Request for Final Payment
Master Consulting Agreement Terms and Conditions
