Integrated HVAC Systems
Building Management Systems
Security & Fire Safety Solutions
Technical Building Services
Commercial Refrigeration
Industrial Refrigeration
Global WorkPlace Solutions
Energy Efficiency & Sustainability
Solutions For Your Building
Global Marine and Navy
Efficiency Now Newsletter
HVAC Training Resources
Case Studies
| ▼ | Technology Contracting |
| • | Buildings |
| • | Construction |
| • | Plan/Design |
| • | Build |
| • | Commission |
| • | Subcontractors |
| • | Canadian Construction |
| • | Canadian Small Subcontracts |
| • | U.S. Construction |
| • | Commission |
| • | Outdoor |
| ► | Construction |
| ► | Innovation Services |
| ► | Networked Solutions |
| ► | Service |
Canadian Small Subcontracts
CANADA - Small Subcontractor Request for Proposal
NOTE: THIS PAGE TO BE USED FOR SUBCONTRACT PROPOSALS LESS THAN $50,000 CAN ONLY. For larger Proposals, see specific country "Construction" pages.
This page is to be used only by Johnson Controls L.P. bidding partners to view and download Johnson Controls standard attachments, standards, practices, procedures, documents and forms that are considered part of an installation Subcontract Request for Proposal.
IMPORTANT NOTE: Submission to Johnson Controls L.P. of a Subcontract Request for Proposal constitutes an acknowledgement by the bidder that the bidder has visited this site and has downloaded and viewed the contents and format of the standard documents, and that the bidder agrees to use these documents in the execution of any subsequent subcontract, except as specifically noted within the proposal, on and in compliance with ATTACHMENT "C", EXCEPTION TO THIS REQUEST FOR PROPOSAL.
If a copy of this file was downloaded prior to the post date, modifications have been made and you should download the revised pdf file.
Review the standard attachment documents BEFORE submitting a proposal. See "IMPORTANT NOTE" above.
NOTE: THIS PAGE TO BE USED FOR SUBCONTRACT PROPOSALS LESS THAN $50,000 CAN ONLY. For larger Proposals, see specific country "Construction" pages.
This page is to be used only by Johnson Controls L.P. bidding partners to view and download Johnson Controls standard attachments, standards, practices, procedures, documents and forms that are considered part of an installation Subcontract Request for Proposal.
IMPORTANT NOTE: Submission to Johnson Controls L.P. of a Subcontract Request for Proposal constitutes an acknowledgement by the bidder that the bidder has visited this site and has downloaded and viewed the contents and format of the standard documents, and that the bidder agrees to use these documents in the execution of any subsequent subcontract, except as specifically noted within the proposal, on and in compliance with ATTACHMENT "C", EXCEPTION TO THIS REQUEST FOR PROPOSAL.
Instructions
Bidder shall verify the current post date of the documents listed below. If you have downloaded this file since the post date, you already have the latest version of attachments and do not need to download a new file.If a copy of this file was downloaded prior to the post date, modifications have been made and you should download the revised pdf file.
Review the standard attachment documents BEFORE submitting a proposal. See "IMPORTANT NOTE" above.
Canada - Small Construction Installation Services
04/15/2003
(Subcontract Proposal Less Than $50,000 CAN)
59 Pages
59 Pages
Standard Attachments for use with subcontracts for construction material and labor as referenced on the standard request for proposal documentation.
These standard attachments apply to all construction trades.
Standard attachments included:
- Subcontract Application for Payment
Subcontract Request for Change Order
Subcontract Change Order
Subcontract Request for Final Payment
Master Subcontract Agreement Terms and Conditions
Subcontract Minimum Safety Requirements, including - Pre-Qualification Criteria and Pre-Bid Information
Canadian Small Subcontracts
