Building Efficiency Commercial & Office
Commercial & Office
Featured Case Study
|
Bank of America PlazaColumbia, South CarolinaEnergy conservation measures helped a South Carolina office building cut annual utility costs by $43,000 and become the first existing building in the state to achieve a LEED® Gold rating. View Case Study (PDF) |
CASE STUDIES
Alberici Constructors
Saint Louis, Missouri A Missouri construction company leveraged Johnson Controls' building system integration capabilities to achieve 60% higher efficiency at its new world headquarters - the world's greenest building. View Case Study (PDF)
Bank of America Plaza
Columbia, South Carolina Energy conservation measures helped a South Carolina office building cut annual utility costs by $43,000 and become the first existing building in the state to achieve a LEED® Gold rating. View Case Study (PDF)
Centro Comercial Lider
Caracas, Venezuela State-of-the art technology seamlessly runs all business, building and specialty systems within this retail complex, providing a comfortable, safe and secure environment for nearly 50,000 daily visitors. View Case Study (PDF)
Colony Park
Jackson, Mississippi With real-time visibility into energy consumption, utility costs and greenhouse gas emissions across its portfolio of buildings, a mixed-use development expects to save 15-20% in energy savings. View Case Study (PDF)
Diversey
Sturtevant, Wisconsin Teamwork and planning helped to make this new corporate headquarters an example of cost-effective sustainable design; construction was completed at a cost 10-15% below the U.S. average. View Case Study (PDF)
Empire State Building
New York New York The iconic building is being retrofitted to become 38% more energy efficient. The innovative approach to deep energy retrofits is projected to save $4.4 million in annual energy costs with a 3.1 year payback on incremental costs. View Case Study (PDF)
The Hi-Rise Group, Inc.
Hamilton, Ontario, Canada Industry expertise, combined with integration capabilities, delivered success in the on-time, on-budget construction of a new federal government building in Ontario, Canada. View Case Study (PDF)
Integrated Design Associates, Inc. (IDeAs)
San Jose, California A unique HVAC and control system contributed to minimizing this design firm's energy consumption, making it the first commercial office building in the United States to achieve net-zero energy. View Case Study (PDF) |
Johnson Controls
Brengel Technology Center Milwaukee, Wisconsin The award-winning building is a showcase for Johnson Controls energy efficient technologies, and demonstrates how it's possible to build a high-performance green building within a conventional budget. View Case Study (PDF)
Johnson Controls
Corporate Headquarters Campus Glendale, Wisconsin Four buildings on the Johnson Controls corporate campus were recently awarded LEED Platinum certification, the highest concentration of LEED Platinum buildings ever recognized by the U.S. Green Building Council. View Case Study (PDF)
Miller Park
Milwaukee, Wisconsin A Johnson Controls Metasys® building management system controls nearly 350 pieces of HVAC for the convertible-roof major-league stadium, contributing to fan comfort and energy savings. View Case Study (PDF)
QS/1 Data Systems
Spartanburg, South Carolina Our industry expertise helped make the LEED certification and commissioning processes flow smoothly for a high-tech company going green. View Case Study (PDF)
Securities Commission Headquarters
Kuala Lumpur, Malaysia In Malaysia’s first modern facility with fully ductless air conditioning, a state-of-the-art building management system controls the under-floor air terminals, mechanical and electrical systems. View Case Study (PDF)
Security Benefit Group
Topeka, Kansas A carefully coordinated design and construction process brought this financial services company's vision to life in a building that delivers both associate comfort and reduced maintenance costs. View Case Study (PDF)
Shanghai World Financial Center
Pudong Shanghai, China Johnson Controls was selected to design, install and implement a single converged network that supports all business and building systems in this 104-story Shanghai sensation known as the “sky garden in the city." View Case Study (PDF)
Toronto-Dominion Centre
Toronto, Canada Upgrades to one of the largest Metasys® building management systems in North America help Toronto-Dominion Centre achieve LEED® Gold Certification and drive significant energy savings in over 4.3 million square feet of office and retail space. View Case Study (PDF) |
