Johnson Controls partners with a global retailer to upgrade fire protection systems across thousands of stores with minimal operational disruption

As one of the world’s largest general merchandise retailers, this customer operates thousands of stores globally and employs millions of people. With a reputation for leadership and innovation, the retailer continues to expand its footprint—but with growth comes new challenges.

When existing fire sprinkler systems needed upgrades to address higher hazard commodity classifications, the retailer sought a solution that could be deployed consistently across its diverse facilities without costly downtime. Johnson Controls stepped in to deliver a program that combined engineering expertise, operational discipline, and custom innovation.

Impact Highlights

fire blue

Over 2 million custom fire sprinklers installed across thousands of locations

dollar decreasing icon

Significant cost savings by avoiding expensive fire pump installations

Minimal operational disruption with upgrades completed during tight timelines

Enhanced fire protection performance tailored to unique store layouts

Meeting the Challenge: Flexible, Cost-Effective Fire Protection

The retailer faced a complex set of requirements. Prescriptive fire sprinkler upgrades would have required increased water discharge and, in many cases, costly fire pumps—adding significant capital expense and downtime. With thousands of stores worldwide, the retailer needed a retrofit solution that was:

  • Economical and repeatable across varied facility sizes and layouts
  • Flexible enough to accommodate complex storage and rack arrangements
  • Compatible with existing infrastructure and water pressure levels
  • Deployable with minimal impact to store operations

Innovative Solutions Delivered at Scale

Johnson Controls leveraged its deep expertise and full line of class-leading fire protection products to design a tailored approach. By analyzing existing facility data—pipe sizes, sprinkler spacing, ceiling heights, and water pressure—Johnson Controls developed multiple solutions that fit within existing water supply parameters, eliminating the cost of fire pumps.

Key steps included:

  • Conducting extensive fire tests to validate design variables
  • Identifying two existing Tyco sprinkler models for certain areas
  • Designing and UL-verifying two new custom sprinklers in under three months—a process that typically takes 12 to 18 months
  • Coordinating manufacturing and delivery as part of a five-year upgrade plan

Safer Stores, Lower Costs, and Operational Continuity

Working closely with the retailer’s fire protection consultants, Johnson Controls successfully implemented multiple solutions across thousands of locations. The program delivered:

  • Over 2 million custom sprinklers installed with unique spray patterns optimized for the retailer’s hazard areas
  • Significant time and cost savings compared to prescriptive upgrades
  • Minimal disruption to operations during installation

This large-scale initiative demonstrates how Johnson Controls combines engineering innovation and operational excellence to help customers achieve their goals.

Building Insights

The one-stop shop for smart buildings news and insights

Take a look

Solutions:

Share

Similar stories

fraser

Fire Protection for Frasers Group’s Automated Warehouse

Frasers Group implemented a bespoke fire detection and extinguishment system to safeguard its 13,000 m² automated warehouse and maintain operational continuity.

colmore

Fire Safety Fit-Out for Birmingham’s Tallest Office Building

103 Colmore Row partnered with Johnson Controls to deliver a compliant fire suppression fit-out for Birmingham’s tallest office building on time and within budget.

Contact us

Please read our Privacy Notice for information on how we protect and manage your personal data. By completing this form and submitting your information, you confirm that you have reviewed, understood and accepted our privacy terms as well as our cookie terms.