Restoring HVAC reliability at Boehringer Ingelheim’s manufacturing plant in Brazil
Boehringer Ingelheim improves HVAC reliability and operational stability at its Campinas plant
Impact Highlights
98% HVAC equipment availability
Improved stability in critical production areas
Reduced energy use
Restoring reliability and compliance in a critical manufacturing environment
After an unsuccessful outsourcing experience, Boehringer Ingelheim faced reliability issues across HVAC systems supporting its Campinas, São Paulo manufacturing plant. The site comprises four buildings producing veterinary pharmaceutical products, with approximately 90% of output exported internationally.
Operating under strict regulatory requirements, the plant relies on tightly controlled temperature, humidity, and pressure conditions to maintain product quality and compliance with standards such as the Globally Harmonized System (GHS). Restoring system reliability and ensuring consistent environmental control were critical to stabilizing operations and supporting uninterrupted production.
Recovering system performance and establishing proactive HVAC maintenance
To restore system reliability, Boehringer Ingelheim entered into an operations and maintenance agreement with Johnson Controls focused on returning HVAC equipment to its original operating condition. Once stability was achieved, a structured preventive maintenance program was implemented to sustain performance.
Over four years, the scope evolved to include predictive maintenance. A dedicated onsite team of 20 resident employees, including technicians and a supervisor, supports continuous 24x7 operations and proactively identifies actions needed to maintain safe, compliant plant performance.
“Johnson Controls has a well-trained and well-led on-site technical team, as well as corporate leadership staff available for strategic discussions.”
Tomas Rebouças
Maintenance Manager, Boehringer Ingelheim
High availability, improved sustainability, and stable operations
Boehringer Ingelheim now maintains 98% availability across HVAC equipment, supporting consistent environmental conditions for pharmaceutical production.
The plant also achieved sustainability improvements, including reduced air exchange volumes in production environments, lower chiller energy consumption, and prevention of leaks in HVAC ductwork. These outcomes support longer-term sustainability objectives and future investments aimed at reducing greenhouse gas emissions and progressing toward Net Zero goals.
About Boehringer Ingelheim
Boehringer Ingelheim is a global pharmaceutical company with operations in Brazil, producing veterinary pharmaceutical products for domestic and international markets.
About the facility
- Pharmaceutical manufacturing plant in Campinas, Brazil
- Four buildings supporting veterinary pharmaceutical production
- Operates under strict environmental control requirements
Solutions:
Similar stories
Manufacturing plant achieves 100% on-time preventative maintenance
A large U.S. manufacturing plant restored HVAC reliability and cut costs with an Asset Lifecycle Management Program, boosting uptime and savings.
Energy-Efficient Cooling for Confectionery Production in Germany
Katjes Fassin GmbH & Co. KG improved efficiency and climate-neutral production with a York YZ Chiller in a compact, energy-saving system for continuous confectionery manufacturing.
Johnson Controls manufacturing plant identifies 52% energy savings per furnace
The UK-based manufacturing plant gained clearer insight into furnace-level consumption, revealing a 52% reduction in energy use per electric furnace and more than $150,000 in projected annual savings with OpenBlue Net Zero Plus.
Graha CIMB Niaga improves energy efficiency in Jakarta
Across its 30,000 m² tower, Graha CIMB Niaga achieves measurable energy savings. With Metasys centralizing HVAC control, the officer tower boosts transparency and streamlines daily operations.

















.jpg?la=en&h=320&w=720&hash=244C75B74F0F77521D56164450973BCD)














.jpg?la=en&h=310&w=720&hash=8D9823F26AA80B2B75C3E4B2E61770DC)


.jpg?la=en&h=320&w=719&hash=13CA7E4AA3E453809B6726B561F2F4DD)
.jpg?la=en&h=306&w=720&hash=F21A7CD3C49EFBF4D41F00691D09AEAC)

.png?la=en&h=320&w=720&hash=18CFCCD916C92D922F600511FABD775D)